Re-design & SEO project started on the 21st of November 2015 which at mid-Jan 2016 was ranking for 1500 keywords. The website was on-page optimised. Result: 1.4 k visitors per month. Extra 1 month SEO campaign. Middle of February 2016: 2.4K ranking keywords.
10
keywords targeted
2400
ranking keywords as a result of the SEO campaign
1400
visitors/month
6